I have a 19ft length garage with a 4.5 inch slope from back to front. The makers of both Mevo Plus and Skytrak state that numbers may be inaccurate as they require a more level surface from unit to screen.
I am more interested in Mevo right now. I am considering building a DIY hitting platform to level from the unit to the front end of my matt. I've seen many such examples on the forum.
From there, has anyone come up with a temporary level to the screen? I'm thinking of extending something retractable from the platform to the screen such as a wind screen or banner.
Has anyone managed this? I need to be able to put it all away to park the cars too.
Or is this all too much work and I need to move to the next spending bracket with a GC2 or Uneekor?
I am more interested in Mevo right now. I am considering building a DIY hitting platform to level from the unit to the front end of my matt. I've seen many such examples on the forum.
From there, has anyone come up with a temporary level to the screen? I'm thinking of extending something retractable from the platform to the screen such as a wind screen or banner.
Has anyone managed this? I need to be able to put it all away to park the cars too.
Or is this all too much work and I need to move to the next spending bracket with a GC2 or Uneekor?
Comment