    It's been a long time coming but here's pics of phase one of my sim build. Thank to all the support and ideas that came from this great forum.

    Some Details:
    • Ceiling Height: 8' 8" at mat
    • Sim: Skytrak and JNPG
    • Impact Screen: First run of direct from the mill (yes I've had this in a box for a very long time!). Behind the screen I have a net and a 1" memory foam mattress topper
    • Projector: BenQ Th671ST
    Next Steps
    • I need to add a solid white sheet behind the impact screen and in front of the net. The net is black and it shows through a bit, plus I think I'm getting some marks coming through on the white screen from rubbing against the black net on ball impact
    • Complete finishing the basement (drywall, wet bar, flooring, etc).
    Let me know your thoughts for improvement and if you have any questions.
    Attached Files

  • #2
    Nice build! To stop balls from sneaking out above the screen, I recommend using cheap thin carpet on ceiling and then hang down the screen. To finish your ceiling I would add plywood, then use air compressor staple gun and staple 2ft x 2ft interlocking foam pads to ceiling. Then staple the carpet to ceiling and let maybe a ft extra hand down the screen. This will seal the top so balls can't escape.

    Here is my post showing this:

    Hey! I'm finally back to sim golfing! Just finished my new build! I moved to a new house and haven't had my golf sim for a year or more. A lot of work has been done

    Comment


    • #3
      Nice I wish I could do a basement build but we dont have basements in Florida.I have same monitor do you like it.

      Comment


      • #4
        Originally posted by Mike80 View Post
        Nice build! To stop balls from sneaking out above the screen, I recommend using cheap thin carpet on ceiling and then hang down the screen. To finish your ceiling I would add plywood, then use air compressor staple gun and staple 2ft x 2ft interlocking foam pads to ceiling. Then staple the carpet to ceiling and let maybe a ft extra hand down the screen. This will seal the top so balls can't escape.

        Here is my post showing this:

        https://golfsimulatorforum.com/forum...mike80-is-back
        Mike80 - good ideas. I still have a ways to go, but my plan was to double drywall the ceiling and then put some carpet tiles. I'm not concerned about losing height directly in front of the screen. I need to go with the double drywall since the wife demanded that I soundproof the room as much as possible. I've seen some nice ways to trim out the screen, but I'll probably take your cheap carpet suggestion in the interim until I finish up the drywall and soundproofing steps.

        Comment


      • #5
        I have an unfinished basement area too. How wide is your space?

        Comment


        • #6
          Awesome build man!
          My Courses: all are LiDAR
          Wilkshire LiDAR
          Glenmoor
          Brookside LiDAR
          Shady Hollow CC​

          Comment


          • #7
            Originally posted by Boverton View Post
            I have an unfinished basement area too. How wide is your space?
            I'm about 13'2" feet wide currently (before the studs were up I had 13'6"). I'll lose a few more inches with the drywall. I use JNPG and I'm offset about 2.5 feet to the right of center.

            Comment


            • #8
              Thanks. I was wondering about the offset too.

              Comment