Hey guys - had a question about potentially getting a little extra clearance from my basement floor to the ceiling. Currently, I have 2x12 ceiling joists that are i think every 16 inches apart (maybe 12", didnt measure exactly). From the floor to the bottom of those joists is 8'8" which is close to an ideal height.
My question is do i have any chance of creating a little 3x3 foot area to get the joists anywhere between 3-6" total? I realize i can't eliminate them entirely, and while i wouldn't be able to swing a driver, i should be able to hit long irons if i can get the height anywhere at or above 9 feet.
Second question is, if anyone has done this or similar, what did the cost run? I'm hoping there's an easier solution than needing to run a bunch of steel beams, but if thats the case, then i'll look to a professional for a quote. I reached out to a handful of structural engineers, but no one seemed to respond - is there another type of person that would have answers to my questions and be able to provide the necessary service?
I'll attach some photos so you guys can see, and will provide more info if asked. Cheers.
My question is do i have any chance of creating a little 3x3 foot area to get the joists anywhere between 3-6" total? I realize i can't eliminate them entirely, and while i wouldn't be able to swing a driver, i should be able to hit long irons if i can get the height anywhere at or above 9 feet.
Second question is, if anyone has done this or similar, what did the cost run? I'm hoping there's an easier solution than needing to run a bunch of steel beams, but if thats the case, then i'll look to a professional for a quote. I reached out to a handful of structural engineers, but no one seemed to respond - is there another type of person that would have answers to my questions and be able to provide the necessary service?
I'll attach some photos so you guys can see, and will provide more info if asked. Cheers.