I have the back half of a detached garage (18' x 20") for my simulator space. The ceiling joists are 8' high (there are 17 of them in the entire structure). I am not an expert- or even a novice- is it feasible to remove 3 or 4 of the joists and reinforce with collar ties to get the last 8" to a foot I need for ceiling clearance (basically creating an 8' wide hitting bay in the back third of the structure).
I have the back half of a detached garage (18' x 20") for my simulator space. The ceiling joists are 8' high (there are 17 of them in the entire structure). I am not an expert- or even a novice- is it feasible to remove 3 or 4 of the joists and reinforce with collar ties to get the last 8" to a foot I need for ceiling clearance (basically creating an 8' wide hitting bay in the back third of the structure).