I have a CCE hitting mat and was thinking about cutting out a 5x5 section of concrete about 2 inches down then using self leveling mix to level the section. Then put in the CCE mat into the cut out to stop it from moving. This will allow me to have an extra inch or so of head room and have the mat level with the surrounding green carpet.
Question is has anyone done this before or have other ideas?
Question is has anyone done this before or have other ideas?
Comment