I am close to finishing my sim room and have a question about the bottom of the impact screen options.
Our room is in the basement and we installed PT 2x4 sleepers, 3/4" sub floor above the concrete slab and then added putting and hitting turf on the floor to allow for us to drop in a handful of 4" deep putting cups. This works great but I am tweaking my Par2Pro SQ Raw screen before I finalized side panels and have a few final questions related to how to handle the bottom of the screen. Based on my research, I believe that I have the following options:
1- Hem the bottom of the screen and insert a full width bungee attached to the angle iron on the sides
2- Hem the bottom and fill a 1.5" nylong tube with sand and adjust height so it is just touching the floor
3- Leave the bottom loose with 4"+ resting on the bottom of the floor
After thinking through my options, I was wondering if anyone has used tarp clips and bungee cords to anchor the bottom of the screen in the same manner as the sides and top? Since I have 4-3/4" of built up flooring, I could easily cut this away and anchor an angle to the concrete slab and connect the bottom of the screen with tarp clips and bungees below the height of the floor to eliminate the fear of bounce back or balls getting behind the net. I would address hitting screen bounce back through the tension of the bungees.
My only concern would be the hitting screen being too tight and increasing the wear on the screen prematurely as I don't have netting or memory foam behind it now.
Thoughts, comments or other ideas would be appreciated.